==Stables and Hippogriff Aerie==
 
==Stables and Hippogriff Aerie==
  
*Work begins on 9.15
+
*Work begins on 9.15 on the Aerie first
  
 
===Stables===
 
===Stables===
 
*Overall Cost of 11,250.
 
*Overall Cost of 11,250.
 
**5,625 labor
 
**5,625 labor
**Two trees of carpenters (240 gp/month)
 
**Three trees of masons (360 gp/month)
 
 
**5,625 materials
 
**5,625 materials
 
***2,000 gp in lumber. 0/2000
 
***2,000 gp in lumber. 0/2000
Line 23: Line 21:
 
*Overall Cost of 3,600.
 
*Overall Cost of 3,600.
 
**1800 labor.
 
**1800 labor.
***Two trees of carpenters (240 gp/month)
+
***Four trees of carpenters (480 gp/month)
***Two trees of masons (240 gp/month)
+
***Two trees of masons (600 gp/month)
 
**1800 materials.
 
**1800 materials.
***800 stone. 0/800
+
***800 stone. 0/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
***1000 lumber. 0/1000
+
***1000 lumber. 0/1000. This translates to 8 loads of lumber, weighing a total of 400 stone and taking 2/3 trip in the river boat.
 +
 
 +
*Month 1 (9.15-10.15):
  
 
==Work Complete on Wolf Keep==
 
==Work Complete on Wolf Keep==

Revision as of 09:32, 28 October 2016

The Wilderlands of Absalom

Commissioned Chain

  • See this post
  • Will cost 100 gp to install
  • Costs 4500 to commission.
    • Chain is commissioned on 9.14 and will be complete on 10.14

Stables and Hippogriff Aerie

  • Work begins on 9.15 on the Aerie first

Stables

  • Overall Cost of 11,250.
    • 5,625 labor
    • 5,625 materials
      • 2,000 gp in lumber. 0/2000
      • 3,625 gp in stone. 0/3625

Aerie

  • Overall Cost of 3,600.
    • 1800 labor.
      • Four trees of carpenters (480 gp/month)
      • Two trees of masons (600 gp/month)
    • 1800 materials.
      • 800 stone. 0/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
      • 1000 lumber. 0/1000. This translates to 8 loads of lumber, weighing a total of 400 stone and taking 2/3 trip in the river boat.
  • Month 1 (9.15-10.15):

Work Complete on Wolf Keep

  • As of 8.14
  • Wolf Keep needs a total of 10,000 gp worth of work done before it becomes fully functional.
    • 2500 carpentry labor-2116/2500
      • 2500 gp worth of lumber-2500/2500
    • 2500 masonry labor-2121/2500
      • 2500 gp worth of stone-2500/2500

Workers Rebuilding the Keep

  • One engineer (250 gp/month)
  • One master carpenter (40 gp/month, minus 25% efficiency for supervising for total of 30 gp)
    • Two journeymen carpenters (30 gp/month, total of 60/month)
      • Four apprentice carpenters (15 gp/month, total of 60/month)
  • One master carpenter (30 gp/month)
    • Two journeymen carpenters (60 gp/month)
      • Four apprentice carpenters (60 gp/month)
  • One master carpenter (30 gp/month)
    • Two journeymen carpenters (60 gp/month)
      • Four apprentice carpenters (60 gp/month)
        • 15 skilled laborers (6 gp/month, total of 18/month)
        • 15 unskilled laborers (3 gp/month, total of 21/month)


  • One master mason (40 gp/month, minus 25% efficiency for supervising for total of 30 gp)
    • Two journeymen masons (30 gp/month, total of 60/month)
      • Four apprentice masons (15 gp/month, total of 45/month)
  • One master mason (30 gp/month)
    • Two journeymen masons (60 gp/month)
      • Four apprentice masons (60 gp/month)
  • One master mason (30 gp/month)
    • Two journeymen masons (60 gp/month)
      • Four apprentice masons (60 gp/month)
        • 15 skilled laborers (6 gp/month, total of 18/month)
        • 15 unskilled laborers (3 gp/month, total of 21/month)

Workers Fixing the Basement

  • One master mason (40 gp/month)
    • Two journeymen masons (total of 60/month)
    • Four apprentice masons (total of 45/month)

Work on the basement will be complete 10.1

Current Labor Totals

  • As of 8.14
  • Carpentry: 585/month
  • Masonry: 585/month

Workers at the Keep but not yet working

Materials

Onsite

6.14
7.14

Commissioned

Junction warehouse