Editing Building Costs
Warning: You are not logged in. Your IP address will be publicly visible if you make any edits. If you log in or create an account, your edits will be attributed to your username, along with other benefits.
The edit can be undone.
Please check the comparison below to verify that this is what you want to do, and then save the changes below to finish undoing the edit.
Latest revision | Your text | ||
Line 33: | Line 33: | ||
'''Construction Time:''' The time required for construction is 1 day per 500 gp spent. This assumes the land has already been cleared and prepared, and that all materials are on hand. For every 100,000 gp spent, one engineer must be hired. | '''Construction Time:''' The time required for construction is 1 day per 500 gp spent. This assumes the land has already been cleared and prepared, and that all materials are on hand. For every 100,000 gp spent, one engineer must be hired. | ||
− | |||
− | |||
− | |||
− | |||