Difference between revisions of "Wolf Keep Construction Schedule"
Thirdkingdom (talk | contribs) (→Commissioned Chain) |
Thirdkingdom (talk | contribs) |
||
Line 29: | Line 29: | ||
*Month 1 (9.15-10.15): | *Month 1 (9.15-10.15): | ||
− | + | *[[Log of Completed Work on Wolf Keep]] | |
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
− | |||
===Current Labor Totals=== | ===Current Labor Totals=== | ||
− | *As of | + | *As of 10.1 |
− | *Carpentry: | + | *Carpentry: 480/month |
− | *Masonry: | + | *Masonry: 600/month |
− | |||
− | |||
===Materials=== | ===Materials=== |
Revision as of 09:35, 28 October 2016
Contents
Commissioned Chain
- See this post
- Will cost 100 gp to install
- Costs 4500 to commission.
- Chain is commissioned on 9.14 and will be complete on 11.14
Stables and Hippogriff Aerie
- Work begins on 9.15 on the Aerie first
Stables
- Overall Cost of 11,250.
- 5,625 labor
- 5,625 materials
- 2,000 gp in lumber. 0/2000
- 3,625 gp in stone. 0/3625
Aerie
- Overall Cost of 3,600.
- 1800 labor.
- Four trees of carpenters (480 gp/month)
- Two trees of masons (600 gp/month)
- 1800 materials.
- 800 stone. 0/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
- 1000 lumber. 0/1000. This translates to 8 loads of lumber, weighing a total of 400 stone and taking 2/3 trip in the river boat.
- 1800 labor.
- Month 1 (9.15-10.15):
Current Labor Totals
- As of 10.1
- Carpentry: 480/month
- Masonry: 600/month