Repairs Log Season Four: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 9: | Line 9: | ||
|- | |- | ||
| || Raspberry Ant Infestation--entire ship, electronics and wiring ||<span style="background:#FFFFFF; color:#000000"><b> To Date </b></span>||<span style="background:#FFFFFF; color:#00000"><b> ''As yet no further complications'' </b></span>|| <span style="background:#F40202; color:#FFFC01"><b> N </b></span> | | || Raspberry Ant Infestation--entire ship, electronics and wiring ||<span style="background:#FFFFFF; color:#000000"><b> To Date </b></span>||<span style="background:#FFFFFF; color:#00000"><b> ''As yet no further complications'' </b></span>|| <span style="background:#F40202; color:#FFFC01"><b> N </b></span> | ||
|- | |||
| 401.0 || Fire in engine room || 401.0 || Fire extinguished || Y | |||
|- | |||
| || Possible damage to systems by engine room fire || || N/A | |||
|- | |||
| || RPG damage to container || || || N | |||
|- | |||
| || Thruster package damaged || || || N | |||
|- | |||
| || Sensor package damaged || 401.0 || Half repaired in orbit, Urvasi || Halfway | |||
|- | |- | ||
|} | |} |
Revision as of 06:10, 9 June 2010
Episode Damaged | Description | Episode Repaired | Description | Y/N |
---|---|---|---|---|
Carry-over from Season Three | ||||
307.0 | Remove both fuel pods | N/A | No plans as yet to replace/reacquire | N |
Raspberry Ant Infestation--entire ship, electronics and wiring | To Date | As yet no further complications | N | |
401.0 | Fire in engine room | 401.0 | Fire extinguished | Y |
Possible damage to systems by engine room fire | N/A | |||
RPG damage to container | N | |||
Thruster package damaged | N | |||
Sensor package damaged | 401.0 | Half repaired in orbit, Urvasi | Halfway |
Go back to Nuts and Bolts, Season One
Go back to Nuts and Bolts, Season Two
Go back to Nuts and Bolts, Season Three
Go back to Nuts and Bolts, Season Four
Go back to Rina's CREW page