Line 21: Line 21:
 
*Overall Cost of 3,600.
 
*Overall Cost of 3,600.
 
**1800 labor.
 
**1800 labor.
***Four trees of carpenters (480 gp/month)
+
***Four trees of carpenters (639 gp/month) plus laborers
***Two trees of masons (600 gp/month)
+
***Five trees of masons (789 gp/month) plus laborers
 
**1800 materials.
 
**1800 materials.
 
***800 stone. 0/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
 
***800 stone. 0/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
Line 28: Line 28:
  
 
*Month 1 (9.15-10.15):
 
*Month 1 (9.15-10.15):
 +
 +
  
 
*[[Log of Completed Work on Wolf Keep]]
 
*[[Log of Completed Work on Wolf Keep]]

Revision as of 09:38, 28 October 2016

The Wilderlands of Absalom

Commissioned Chain

  • See this post
  • Will cost 100 gp to install
  • Costs 4500 to commission.
    • Chain is commissioned on 9.14 and will be complete on 11.14

Stables and Hippogriff Aerie

  • Work begins on 9.15 on the Aerie first

Stables

  • Overall Cost of 11,250.
    • 5,625 labor
    • 5,625 materials
      • 2,000 gp in lumber. 0/2000
      • 3,625 gp in stone. 0/3625

Aerie

  • Overall Cost of 3,600.
    • 1800 labor.
      • Four trees of carpenters (639 gp/month) plus laborers
      • Five trees of masons (789 gp/month) plus laborers
    • 1800 materials.
      • 800 stone. 0/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
      • 1000 lumber. 0/1000. This translates to 8 loads of lumber, weighing a total of 400 stone and taking 2/3 trip in the river boat.
  • Month 1 (9.15-10.15):



Current Labor Totals

  • As of 10.1
  • Carpentry: 480/month
  • Masonry: 600/month

Materials

Onsite

6.14
7.14

Commissioned

Junction warehouse