Nuts and Bolts, Season Six: Ship Repairs
Episode | Date | Damage | Episode | Date | Repaired |
601 | 10 Oct 2522 | Heat damage to hull(+2w/3s), propulsion(+1w), sensors(+1w) (+4w/3s) | 601 | 15-16 Oct 2522 | Incomplete repairs to hull (-1w/3s) |
604 | 604 | 12-13 Nov 2522 | Remainder of repairs completed (-3w) | ||
605 | 15 Nov 2522 | Internal structural dmg (+1w), outer hull(+1w), internal gravity(+1w), starboard fuel tank vented(+1w), stb. thruster offline(+1w) | 605 | 16-17, 19 Nov 2522 | 16-17 Nov: Partial repairs on grav, internal structure, outer hull (-2w); 19 Nov: Stb. fuel tank, stb. thruster (-2w); Damage remaining: grav (+1w) |
606 | 23 Nov 2522 | Corrosive mine: breach on crew and pax decks (+1w) | 606 | 23 Nov 2522 | Breaches repaired enough to survive atmo. (-1w) |
25 Nov 2522 | Atmo landing, burn through (+1w/1s) | 606 | 26 Nov 2522 | Total damage: (+2w/+1s); Partially repaired enough to fly to Angel (-1w/1s); Remaining damage: (-1w) | |
607 | 607 | 26 Nov - 07 Dec 2522 | Remaining damage repaired. 0w/0s remaining. |
Go back to Nuts and Bolts
Go to Rina's Crew Page