Wolf Keep Construction Schedule
Commissioned Chain
- See this post
- Will cost 100 gp to install
- Costs 4500 to commission.
- Chain is commissioned on 9.14 and will be complete on 11.14
Stables and Hippogriff Aerie
- Work begins on 9.15 on the Aerie first
Stables
- Overall Cost of 11,250.
- 5,625 labor
- 5,625 materials
- 2,000 gp in lumber. 0/2000
- 3,625 gp in stone. 0/3625
Aerie
- Overall Cost of 3,600.
- 1800 labor.
- Four trees of carpenters (639 gp/month) plus laborers
- Five trees of masons (789 gp/month) plus laborers
- 1800 materials.
- 800 stone. 250/800. This translates to seven loads of stone, weighing a total of 1400 stone and taking 2.3 trips in the river boat.
- 1000 lumber. 500/1000. This translates to 8 loads of lumber, weighing a total of 400 stone and taking 2/3 trip in the river boat.
- 1800 labor.
- Month 1 (9.15-10.15):
- Two units of stone and four units of lumber purchased.
Current Labor Totals
- As of 10.1
- Carpentry: 480/month
- Masonry: 600/month