Repairs Log Season Two

From RPGnet
Revision as of 23:44, 25 August 2009 by Taimdala (talk | contribs)
Jump to: navigation, search

Season Interim

  • 22-Aug-2519 to 22-Dec-2519: Far too many things to list completely. Suffice it to say, Summer's Gift received a major overhaul and revamp, gaining four semi-retractable thruster pods, a turbo booster, a machine shop for Rina and scrap to stock it, an extra shuttle complete with interior ship access for Christian, a new dedicated container for Rick's arboretum/lab/aquarium, cameras and an upgraded sensor package for Nika, and as many creature comforts in the way of furnishings, food and amusements we could reasonably carry. We've removed both escape pods so as to use their bays to expand Arden's medical facilities and to gain a crew lounge below decks.

Episode 201: Crossroads

  • 22-Dec-2519: None needed...
  • 25-Dec-2519: ...Although we do get an extra fuel pod from Shyla and PDF Decatur.

Episode 201 to 204: None needed.
Episode 205: Of The Damned

  • 22-Feb-2520: The fuel lines to the newly-installed thruster pods act up and Rina finds she'll need to make the lines uniform in diameter and length to take care of the problem. That is a job reserved for dry dock or an extended period on the ground, neither options are currently available. She takes the pods off-line and the Gift flies on with her original engines as the sole means for thrust.





Go back to Rina's Crew Page
Go back to Nuts and Bolts, Season Two