Repairs Log Season 0ne

From RPGnet
Jump to: navigation, search

Episode 0.0

  1. 04-May-2518: Various repairs to ship, TBD
  2. 29-May-2518: Reinforced reactor containment field. It's fixed. Rina's sure. 83-86% sure, anyway.

Episode 101.0 Bat Out Of Hell

  1. 01-Jun-2518: Ships transponder beacon disengaged to shut off automatic transmission
  2. 01-Jun-2518: Ships transponder beacon reengaged to automatically transmit
  3. 01-Jun-2518: Lock controls for gun locker; partial bypass, later restored to normal condition
  4. 03-Jun-2518: gun taped inside atmo vent, upper deck, midships corridor, portside, aft of portside head
  5. 04-Jun-2518: Bilge filters replaced
  6. 05-Jun-2518: front portside container detach controls; upper deck; modified to bypass remote detach from the bridge; now set to manual detach procedure

Episode 102.0 A-Team

  1. 10-Jun-2518: Remote engine start-up board; installed on bridge for duration of caper

Episode 103.0 Summer’s Gift

  1. 14-Jun-2518: Purchase of Ball Bearings for the Grav Rotor; 10 credits; source of purchase: Paquin
  2. 14-Jun-2518: Installation of Ball Bearings for the Grav Rotor
  3. 04-Jul-2518: Pulse Beacon Data reformatted; ship name: Maddy's Gambit, owner name: Hope Taswell
  4. 04-Jul-2518: Pulse Beacon Data reformatted during legal transfer of ownership; ship name: Summer's Gift, co-owners' names: Nika Earhart, Christian Edge, Marina Kseniya Sebastien, Arden689; recorded and notarized: Lucifer's Landing, Orphan, Angel, Kalidassa (Xuan Wu) System

Episode 104.0 Racing the Clock

  1. 06-Jul-2518: Rina modifies the engines to get more thrust. There’s damage, as yet unspecified that she will have to repair.
  2. 06-Jul-2518: Late on the same day, she repairs the interior damage. Exterior damage to the ship cannot be repaired while we are travelling on pulse. We will have to wait until we come out of pulse to make external repairs.

Episode 105.0 Volatility

  1. 07-Jul-2518: Further investigation reveals our ventral trim vanes are damaged. Rina cannot go out in a suit while the ship is traveling on pulse to repair them--doing so is tantamount to a death sentence. She will have to wait til we kiss dirt or go to dry dock to make repairs.
  2. 07-Jul-2518: Repairs of the damage are made by a ship repair crew, in trade for services rendered to client. The repairs take a couple of days to complete.

Episode 106.0 Convergence

  • None needed. Actually, some repairs left undone by repair crew, but nothing that would keep us from flying.

Episode 107.0 What Lies Beneath

  • None needed.

Episode 108.0 Reunions

  1. 11-Sep-2518: Master router for the external gravity shield generator fails. Rina manages to yank the internal master router for the internal gravitics and graft it to the externals, but it costs us internal grav fields and we travel on in zero-g.
  2. 19-20-Sep-2518: The external router is repaired in a two-day job and the internal router is returned to its rightful place.

Episode 109.0 Breaks

  1. 21-Oct-2518: Rina makes the needed cosmetic repairs to bring the engine room up to code for a surprise inspection. It takes a metric butt-load of scrapware from our stores. Like...2,000 pounds of it. A ton. With Mike's help, she gets the job done.

Episode 110.0 Coalescence

  • None needed.

Episode 111.0 Exit Strategies

  • None needed.

Episode 112.0 Repercussions

  1. 04-Nov-2518: Monthly Mandatory Maintenance, to be verified by port authorities. (Typical: further entries for unusual circumstances only)

Episodes 113.0 through 18.0

  • None needed

Game 19.0 Extraction

  1. 07-Feb-2519: Repair navigation computer, which had been hacked to read the nav history
  2. 07-Feb-2519: Removal of transponder, installed to give away our position

Episode 120.0 Drawing Fire

  1. 05-Apr-2519: During a rescue operation on Perdido's surface, storm debris punctured the hull and ruptured a hydrogen fuel tank. Rina isolated the tank and shunted the remaining fuel into the other tanks. Perdido Station repair crews repaired the damage as repayment for the rescue op.

Episodes 121.0 through 23.0

  • None needed

Episode 124.0 Allies and Adversaries

  1. 30-Jun--03-Jul-2519: We purchase and install an auxillary fuel tank, increasing our travel capacity.

Episode 125.0 Highgate

  1. 04-Jul-2519: We sustain damage from a runaway ship while in parking orbit over Londinium.
  2. 04-Jul--01 Aug-2519: Rina repairs the damage sustained over Londinium over the next 4 weeks.

Episode 126.0 Ambush

  1. 15-Aug-2519 We sustain damage from enemy missiles and burning through atmo in damaged state. We manage to land, albeit severely damaged, and extensive repairs must be made to regain spaceworthiness.

Episode 127.0 Pax Sine Iustitia

  1. 18 to 22-Aug-2519 We fly our shuttle to Pala and sustain damage going through the hurricane over the island. During our short stay there, Rina repairs the shuttle well enough to fly it out of there.




Go back to Rina's Crew Page